Monday, May 26, 2025

Portfolio 1 - Mid Check

 




Schedule - 

Week 1 - Blockout Stage

5/20/2025 - Body proportions and hard-surfaced items blocked out. References collected.
Clothes blocked out.

Week 2 - Hardsurfaced & Basic Clothes

5/24/2025 - Hard-surfaced portions finished without hi-poly details. Clothes 'blockout' completed.

5/25/2025 - Hard-surfaced hi-poly half-way finished.

Week 3 - Hardsurfaced & Clothes Detailing

5/29/2025 - Zbrush detailing finished on hard-surfaced.

6/03/2025 - Retopology.

Week 4 - Texturing

6/10/2025 - Texturing should be mostly done.

6/16/2025 - Model finished with high quality renders.





Monday, May 19, 2025

Portfolio 1 - Blockout Stage

References - 


Research - 


Blockout - 









Unreal Blockout - 



Schedule - 

Week 1 - Blockout Stage

5/20/2025 - Body proportions and hard-surfaced items blocked out. References collected.
Clothes blocked out.

Week 2 - Hardsurfaced & Basic Clothes

5/24/2025 - Hard-surfaced portions finished without hi-poly details. Clothes 'blockout' completed.

5/25/2025 - Hard-surfaced hi-poly half-way finished.

Week 3 - Hardsurfaced & Clothes Detailing

5/29/2025 - Zbrush detailing finished on hard-surfaced.

6/03/2025 - Retopology.

Week 4 - Texturing

6/10/2025 - Texturing should be mostly done.

6/16/2025 - Model finished with high quality renders.

Wednesday, May 14, 2025

Physical Fabrication Projects

 

  • One Sticker Set created using the Cricut machine (The artwork must be original; it can be 2D, 3D, or a hybrid.)






  • One T-Shirt Design (Final output must be a wearable, printed T-shirt.)

N/A
  • One Fine Art Print to be displayed in the hallway.








  • One Large Filament 3D Print





  • One Small to Medium Resin 3D Print







Portfolio 3 Week 3